News Items 1999
|
|
News Items 1999 |
Confront Future Issues with AET and Flexible Space To create a truly intelligent building. One that exists at the forefront of modern building design. To achieve these it is imperative that building services are considered at the beginning of the design phase. This allows maximum flexibility and manageability throughout the construction process, and provides benefits in reducing costs, avoiding wastage of materials, and increasing profitability for building services, and the use of the building itself. |
AET at 'The Centre' in Hong KongIn a $HK82.5m contract, AET's biggest project to date, over 90,000 sq. ms. of the Hiross FlexibleSpace underfloor air-conditioning system has recently been installed at the H6 development in Hong Kong. Often known as ‘The Centre’ this 73-storey building is located in the Queen’s Road Central district adjacent to the Hong Kong Express railway station. |
AET cool Pru in BelfastAir Conditioning and raised access floors in the new Beacon House Prudential building at Clarendon Dock, Belfast |
AET on Holloway RoadAET are installing the Hiross FlexibleSpace underfloor air-conditioning system on all 9 floors of the University of North London's new Technology Tower on the Holloway Road. A major feature will be a 300-seat lecture theatre on the ground floor. The building space will offer state-of-the-art PC terminals and interactive multi-media equipment for teaching and research. |
AET cool MandS in BelfastNesite Raised Access Floor gives space for air conditioning and all other services leaving a clear sales space at at the new Marks and Spencer store at Newton Breda near Belfast. |
AET on the Great West RoadAs part of a £9m refurbishment project, AET ( are installing the Hiross FlexibleSpace underfloor air-conditioning system at the JC Decaux building on the Great West Road, near Boston Manor in West London. |
If you are afraid of change, don't look down now! - 19 April 99As soon as commercial property developers really grasp the idea of how much money can be saved by siting air-conditioning beneath a raised floor, rather than overhead in ceiling voids, the latter breed of system will disappear |
AET fit bill in BilboaMovinord 82 demountable partitioning system is currently being used at the Cruces Hospital in Bilbao. The value of the partitioning is in excess of $1.6m and application areas include surgery rooms, intensive care facilities, radiology units and reception rooms and X-ray units. |
AET TAKING RESERVATIONSPart of a £4m project, AET have supplied the Hiross underfloor air conditioning system to the British Midland reservation centre at East Midlands airport in Castle Donnington near Nottingham. Here Sir Michael Bishop, Chairman of British Midland is shown round the reservation centre. |
AET Cool First PointAET have supplied the Hiross flexible space underfloor air conditioning system to the BAA Lynton First Point building in Gatwick. The system has been installed throughout the development and is capable of subdivision into 16 separate zones.Press Release
|
|
|
![]() |
|
|