Case Study

| all |

8 Waterloo Place

London, UK

A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services. Shortlisted for 2017 BREEAM Awards.

Total Area

3065 sq m

System
CAM-C Direct Expansion Underfloor supply air, underfloor return air

2017 Refurbishment

Fabulous Edwardian building with a Grade II listed Portland Stone façade. A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services, creating 3000 sq m of prime office space in the St James’ area of London. Both the client and Architect requested a clean finish with no services at high level to allow the decorative feature plasterwork in the ceiling to be exposed, underfloor air conditioning was subsequently specified by consultant Watkins Payne Partnership for four of the seven floors.

Shortlisted for 2017 BREEAM Awards – Refurbishment category

Architect – Morrow and Lorraine
Consultant – Watkins Payne Partnership
Main Contractor – Scott Osborne
M & E Contractor – Centurion Air Conditioning


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

77 Farringdon Road

Historic building in Clerkenwell offering six floors of warehouse style accommodation with exposed brickwork walls and underfloor air conditioning installed throughout

Refurbishment

75-79 York Road

Tired high-rise office block adjacent to Waterloo station transformed in 2009 with a series of extensions, new façade cladding and new plant and services, including underfloor air conditioning

Refurbishment

Bankside Studios

Bankside Studios was completed in October 2001, the six floors offering a total of 3,900 sq. m office space with underfloor air conditioning installed throughout.

Refurbishment

iQuest Headquarters

Redevelopment of former Flacăra factory site in Cluj Napoca, creating new Romanian Headquarters for German IT company, iQuest.

New Build Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.