Case Study

| all |

8 Waterloo Place

London, UK

A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services. Shortlisted for 2017 BREEAM Awards.

Total Area

3065 sq m

System
CAM-C Direct Expansion Underfloor supply air, underfloor return air

2017 Refurbishment

Fabulous Edwardian building with a Grade II listed Portland Stone façade. A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services, creating 3000 sq m of prime office space in the St James’ area of London. Both the client and Architect requested a clean finish with no services at high level to allow the decorative feature plasterwork in the ceiling to be exposed, underfloor air conditioning was subsequently specified by consultant Watkins Payne Partnership for four of the seven floors.

Shortlisted for 2017 BREEAM Awards – Refurbishment category

Architect – Morrow and Lorraine
Consultant – Watkins Payne Partnership
Main Contractor – Scott Osborne
M & E Contractor – Centurion Air Conditioning


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Shorelines ITT

The Shorelines Building in Birkenhead is a converted Victorian railway shed constructed in 1889 and fully refurbished in 2012 offering Grade-A office accommodation

Refurbishment

Fleet House

Headroom in the building is severely restricted and underfloor air conditioning was specified to overcome this whilst providing full air conditioning to the commercial offices

Refurbishment

The Weighbridge Building, Marlow

Refurbished in 2000, the underfloor air conditioning system has allowed the historic timber beams to be retained, offering a unique contemporary office space with historical features.

Refurbishment

Endeavour House

The final project of a series of buildings commissioned by airports developer BAA Lynton and reviewed under the Egan initiative, Endeavour house is a replica of the First Point building at Gatwick airport and of the World Business Centre at Heathrow.

New Build

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.