Case Study

| all |

8 Waterloo Place

London, UK

A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services. Shortlisted for 2017 BREEAM Awards.

Total Area

3065 sq m

System
CAM-C Direct Expansion Underfloor supply air, underfloor return air

2017 Refurbishment

Fabulous Edwardian building with a Grade II listed Portland Stone façade. A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services, creating 3000 sq m of prime office space in the St James’ area of London. Both the client and Architect requested a clean finish with no services at high level to allow the decorative feature plasterwork in the ceiling to be exposed, underfloor air conditioning was subsequently specified by consultant Watkins Payne Partnership for four of the seven floors.

Shortlisted for 2017 BREEAM Awards – Refurbishment category

Architect – Morrow and Lorraine
Consultant – Watkins Payne Partnership
Main Contractor – Scott Osborne
M & E Contractor – Centurion Air Conditioning


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Blackheath High School

Blackheath High School, an independent day school for girls and part of the Girls’ Day School Trust (GDST) network, recently invested £18 million to provide new state of the art facilities including a new library and resource centre.

New Build

One Benjamin Street, London

The new build offers 1692 sq. m. high quality office space with highly flexible, column free floor plates, with internal floor to ceiling heights of 1.8 m.

New Build

Mikrotik, Latvia

Underfloor air conditioning supplied for the historic VEF factory redevelopment in Riga, Latvia

Refurbishment

55 Gresham Street

Underfloor air conditioning was specified for the new ninth floor office level so that floor to ceiling height could be maximised, promoting the best architectural vision.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.