Bankside Studios

Southwark, UK

Bankside Studios was completed in October 2001, the six floors offering a total of 3,900 sq. m office space with underfloor air conditioning installed throughout.

Total Area

3,900 sq m

System
CAM-C Underfloor supply air, underfloor return air

2001 Refurbishment

Bankside Studios was completed in October 2001.  A full refurbishment unifying three separate buildings over a continuous stone base with the main design feature being the canting out of the two upper floors over the street in increasing degrees.  The six floors offer a total of 3,900 sq. m office space with underfloor air conditioning installed throughout.

The building with its bold, sculptural appearance has become a focal point at the junction of Great Guildford Street and Southwark Street, where the two canted elevations meet to form an oblique angled corner.

Architect – CZWG

Consultant – Fulcrum

Developer – The Manhattan Loft Corporation

Main Contractor – Wallis


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

The Weighbridge Building, Marlow

Refurbished in 2000, the underfloor air conditioning system has allowed the historic timber beams to be retained, offering a unique contemporary office space with historical features.

Refurbishment

Endeavour House

The final project of a series of buildings commissioned by airports developer BAA Lynton and reviewed under the Egan initiative, Endeavour house is a replica of the First Point building at Gatwick airport and of the World Business Centre at Heathrow.

New Build

169 Union Street

The four storey red brick building dates back to 1905 and originally served as a Royal Mail sorting office. Underfloor air conditioning was specified to overcome restrictive height limitations common in older stock buildings.

Refurbishment

Battersea Studios

The redevelopment by Helical Barr created 52,000 sq ft speculative office space with underfloor air conditioning allowing flexibility for future division.