Case Study

| all |

Here East Innovation Centre

London, UK

The Here East project announced in 2013 has transformed the former Olympic Press and Broadcast spaces at the Queen Elizabeth Olympic Park into Europe’s biggest technology hub.

Total Area

5000 sq m

System
CAM-V Underfloor supply air, high level return air

2017 Refurbishment

The Here East project announced in 2013 has transformed the former Olympic Press and Broadcast spaces at the Queen Elizabeth Olympic Park into Europe’s biggest technology hub. The Plexal innovation centre is housed in the former press centre and contains flexible offices suitable for start-ups and technology companies. The CAM-V configuration is ideally suited to the “hangar-style” building and allows the greatest flexibility for future reconfiguration of the space. The CAM are positioned along the central Plexal corridor within special acoustic enclosures. The underfloor system was also required to run in conjunction with other services; the 4-pipe fan coils cooling the mezzanine co-working areas and the pre-existing trench heating system installed around the perimeter.

Architect – Grimshaw Architects
Consultant – Cundall
Main Contractor – Paragon Interiors Group
M & E Contractor – McDowall Air Conditioning


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Lingotto Building, Italy

The Lingotto Building in Turin is famous for being the former site of the Fiat factory, and at one point, the world’s largest car automobile factory.

Triangula Bastion, Latvia

Triangula Bastion is a distinctive mixed use development located in a prominent position on the banks of the river Daugava in Riga

Refurbishment

Flax House, Belfast

Flax House is a five storey Victorian building with red brick , warehouse style construction, located on Adelaide Street in the Linen Quarter of Belfast.

Refurbishment

Institute of Physics

Designed by Architect, Tate Hindle, the new building has a number of energy saving and sustainability features, designed to perform both during construction, and over the building’s lifetime.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.