Case Study

| all |

Jaguar Land Rover Manufacturing Plant

Staffordshire, UK

AET Fantiles with additional electric trim heaters offered the same performance as trench heating system, but with much greater flexibility.

Total Area

1274 sq m

System
CAM-C Underfloor supply air, underfloor return air

2016 New Build

The new building is part of JLR’s manufacturing expansion plans adding to the £500 million engine plant on the i54 Business Park, opened at the end of 2014.

The initial HVAC brief specified trench heating for the perimeter areas of the office facilities.  M&E specialists NG Bailey were satisfied that AET Fantiles with additional electric trim heaters could offer the same performance, but with greater flexibility than the trench heating system.  This fitted nicely with Jaguar Land Rover’s outline strategy to create a transformational working environment, providing a showcase for environmental sustainability.

The building is expected to achieve BREEAM Excellent.

Architect – Associated Architects
Client – Jaguar Land Rover
Consultant – Arup
M&E Consultant – NG Bailey


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Shatin Industrial Centre

Underfloor air conditioning was specified for the project at Shatin Industrial Centre, transforming the entire sixth floor into a co-working space specifically for a community of designers and architects.

Refurbishment

The Hoxton (Wedge House)

The Hoxton Hotel incorporates 192 hotel rooms, restaurants, bars and function rooms, as well as 4,000m2 of flexible co-working office space, the all within a sleek and contemporary building.

Refurbishment

The Stills (76 Turnmill Street)

This comprehensive refurbishment of a drab, 1970s Government-owned office block (formerly Layden House) has transformed the façade and created 38,000 sq. ft of contemporary office space.

Refurbishment

SAS Marlow

Since the installation of AET’s UfAC system and completion of the fit-out works, SAS’s staff have been able to move back into their new office environment. Many of them have already commented on the vastly improved working conditions.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.