Case Study

| all |

Jaguar Land Rover Manufacturing Plant

Staffordshire, UK

AET Fantiles with additional electric trim heaters offered the same performance as trench heating system, but with much greater flexibility.

Total Area

1274 sq m

System
CAM-C Underfloor supply air, underfloor return air

2016 New Build

The new building is part of JLR’s manufacturing expansion plans adding to the £500 million engine plant on the i54 Business Park, opened at the end of 2014.

The initial HVAC brief specified trench heating for the perimeter areas of the office facilities.  M&E specialists NG Bailey were satisfied that AET Fantiles with additional electric trim heaters could offer the same performance, but with greater flexibility than the trench heating system.  This fitted nicely with Jaguar Land Rover’s outline strategy to create a transformational working environment, providing a showcase for environmental sustainability.

The building is expected to achieve BREEAM Excellent.

Architect – Associated Architects
Client – Jaguar Land Rover
Consultant – Arup
M&E Consultant – NG Bailey


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Shorelines ITT

The Shorelines Building in Birkenhead is a converted Victorian railway shed constructed in 1889 and fully refurbished in 2012 offering Grade-A office accommodation

Refurbishment

Fleet House

Headroom in the building is severely restricted and underfloor air conditioning was specified to overcome this whilst providing full air conditioning to the commercial offices

Refurbishment

The Weighbridge Building, Marlow

Refurbished in 2000, the underfloor air conditioning system has allowed the historic timber beams to be retained, offering a unique contemporary office space with historical features.

Refurbishment

Endeavour House

The final project of a series of buildings commissioned by airports developer BAA Lynton and reviewed under the Egan initiative, Endeavour house is a replica of the First Point building at Gatwick airport and of the World Business Centre at Heathrow.

New Build

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.