Case Study

| all

JC Decaux

London, UK

Art Deco Architecture on the Great West Road.

Total Area

2,500 sq m

System
CAM-C Under Floor Supply, Under Floor Return Air

2000 Refurbishment

Grade II Listed 1930’s building transformed into modern, functional work space.

Art Deco Architecture designed by Foster & Partners, and restored in accordance to advice by English Heritage.

JCDecaux is one of the world’s leading suppliers of advertising space. The building is comprised of three distinct parts; a newly built pre-fabricated Warehouse, refurbished administrative offices and exhibition space in the form of a covered street displaying billboards and JCDecaux’s range of street furniture.

Services Consultants BDSP specified underfloor air conditioning for the office areas as a solution to the floor to ceiling height restrictions. 8 x CAM downflow units and 96 x fan terminal units serve 8 zones.

Architect – Foster and Partners
Client – JC Decaux
Consultant – Mott MacDonald
M+E Consultant – BDSP
Quantity Surveyor – Davis Langdon & Everest


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Triangula Bastion, Latvia

Triangula Bastion is a distinctive mixed use development located in a prominent position on the banks of the river Daugava in Riga

Refurbishment

Flax House, Belfast

Flax House is a five storey Victorian building with red brick , warehouse style construction, located on Adelaide Street in the Linen Quarter of Belfast.

Refurbishment

Institute of Physics

Designed by Architect, Tate Hindle, the new building has a number of energy saving and sustainability features, designed to perform both during construction, and over the building’s lifetime.

Refurbishment

Blackheath High School

Blackheath High School, an independent day school for girls and part of the Girls’ Day School Trust (GDST) network, recently invested £18 million to provide new state of the art facilities including a new library and resource centre.

New Build

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.