Case Study

| all

JC Decaux

London, UK

Art Deco Architecture on the Great West Road.

Total Area

2,500 sq m

System
CAM-C Under Floor Supply, Under Floor Return Air

2000 Refurbishment

Grade II Listed 1930’s building transformed into modern, functional work space.

Art Deco Architecture designed by Foster & Partners, and restored in accordance to advice by English Heritage.

JCDecaux is one of the world’s leading suppliers of advertising space. The building is comprised of three distinct parts; a newly built pre-fabricated Warehouse, refurbished administrative offices and exhibition space in the form of a covered street displaying billboards and JCDecaux’s range of street furniture.

Services Consultants BDSP specified underfloor air conditioning for the office areas as a solution to the floor to ceiling height restrictions. 8 x CAM downflow units and 96 x fan terminal units serve 8 zones.

Architect – Foster and Partners
Client – JC Decaux
Consultant – Mott MacDonald
M+E Consultant – BDSP
Quantity Surveyor – Davis Langdon & Everest


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

ICBC Headquarters, Beijing

The largest commercial bank in China, the Industrial and Commercial Bank of China Limited (ICBC) has adopted the concept of underfloor air conditioning.

New Build

BMW China Services, Shanghai

Fantile units were supplied for the BMW office areas to enhance air conditioning performance.

New Build

JEBN HQ, Hong Kong

Underfloor air conditioning was specified for the 7th floor of the building due to its flexibility and excellence of indoor air quality.

Refurbishment

41 Lothbury

Fully redeveloped in 2004, the building offers a blend of contemporary office accommodation with historical period features.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.