Microsoft Shanghai

Shanghai, China

A five storey new build construction for Microsoft Zizhu Campus in Shanghai, China

Total Area

50,000 sq m

System
Hybrid – Large AHU and Fantiles

2009 New Build

Each floor is divided into 50 zones with an AHU supplying underfloor air to the recessed Fantile units. Construction time was reduced to five months and the owner-occupiers benefit from a flexible, user friendly system providing a high level of indoor air quality.

Developer – Microsoft
Consultant – Shanghai JM Imtech Facility Services


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

ICBC Headquarters, Beijing

The largest commercial bank in China, the Industrial and Commercial Bank of China Limited (ICBC) has adopted the concept of underfloor air conditioning.

New Build

BMW China Services, Shanghai

Fantile units were supplied for the BMW office areas to enhance air conditioning performance.

New Build

JEBN HQ, Hong Kong

Underfloor air conditioning was specified for the 7th floor of the building due to its flexibility and excellence of indoor air quality.

Refurbishment

41 Lothbury

Fully redeveloped in 2004, the building offers a blend of contemporary office accommodation with historical period features.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.