Case Study

| all |

Microsoft Shanghai

Shanghai, China

A five storey new build construction for Microsoft Zizhu Campus in Shanghai, China

Total Area

50,000 sq m

System
Hybrid – Large AHU and Fantiles

2009 New Build

Each floor is divided into 50 zones with an AHU supplying underfloor air to the recessed Fantile units. Construction time was reduced to five months and the owner-occupiers benefit from a flexible, user friendly system providing a high level of indoor air quality.

Developer – Microsoft
Consultant – Shanghai JM Imtech Facility Services


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

17 Devonshire Square

Full refurbishment of the severely height restricted building located on a prominent corner position of Devonshire Square.

New Build

8 Waterloo Place

A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services. Shortlisted for 2017 BREEAM Awards.

Refurbishment

Here East Innovation Centre

The Here East project announced in 2013 has transformed the former Olympic Press and Broadcast spaces at the Queen Elizabeth Olympic Park into Europe’s biggest technology hub.

Refurbishment

Bloomberg City Gate House

Flexible Space Under Floor Air Conditioning was supplied to create a high level of air conditioned comfort for this height restricted, densely occupied building.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.

AET Flexible Space

Advanced Ergonomic Technologies Ltd
The Center, 201 - 203 London Road
East Grinstead
West Sussex
RH19 1HA, UK

+44 (0) 1342 310400

Registered in England No. 2874101
VAT Registration – 602 7742 55

Follow us

Linkedin Twitter YouTube