Microsoft Shanghai

Shanghai, China

A five storey new build construction for Microsoft Zizhu Campus in Shanghai, China

Total Area

50,000 sq m

System
Hybrid – Large AHU and Fantiles

2009 New Build

Each floor is divided into 50 zones with an AHU supplying underfloor air to the recessed Fantile units. Construction time was reduced to five months and the owner-occupiers benefit from a flexible, user friendly system providing a high level of indoor air quality.

Developer – Microsoft
Consultant – Shanghai JM Imtech Facility Services


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

The Weighbridge Building, Marlow

Refurbished in 2000, the underfloor air conditioning system has allowed the historic timber beams to be retained, offering a unique contemporary office space with historical features.

Refurbishment

Endeavour House

The final project of a series of buildings commissioned by airports developer BAA Lynton and reviewed under the Egan initiative, Endeavour house is a replica of the First Point building at Gatwick airport and of the World Business Centre at Heathrow.

New Build

169 Union Street

The four storey red brick building dates back to 1905 and originally served as a Royal Mail sorting office. Underfloor air conditioning was specified to overcome restrictive height limitations common in older stock buildings.

Refurbishment

Battersea Studios

The redevelopment by Helical Barr created 52,000 sq ft speculative office space with underfloor air conditioning allowing flexibility for future division.

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.