Case Study

| all |

Microsoft Shanghai

Shanghai, China

A five storey new build construction for Microsoft Zizhu Campus in Shanghai, China

Total Area

50,000 sq m

System
Hybrid – Large AHU and Fantiles

2009 New Build

Each floor is divided into 50 zones with an AHU supplying underfloor air to the recessed Fantile units. Construction time was reduced to five months and the owner-occupiers benefit from a flexible, user friendly system providing a high level of indoor air quality.

Developer – Microsoft
Consultant – Shanghai JM Imtech Facility Services


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Bankside Studios

Bankside Studios was completed in October 2001, the six floors offering a total of 3,900 sq. m office space with underfloor air conditioning installed throughout.

Refurbishment

iQuest Headquarters

Redevelopment of former Flacăra factory site in Cluj Napoca, creating new Romanian Headquarters for German IT company, iQuest.

New Build Refurbishment

Avaya – 1000 Cathedral Hill

An excellent example of cooling atrium areas using underfloor air conditioning, removing the need for false or suspended ceilings to hide services ductwork

New Build Refurbishment

Menara Telekom Tower

The building represents a landmark in intelligent architecture and its 6-star rating reflects the green building design and commitment to energy efficiency and sustainability.

New Build

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.