Microsoft Shanghai

Shanghai, China

A five storey new build construction for Microsoft Zizhu Campus in Shanghai, China

Total Area

50,000 sq m

System
Hybrid – Large AHU and Fantiles

2009 New Build

Each floor is divided into 50 zones with an AHU supplying underfloor air to the recessed Fantile units. Construction time was reduced to five months and the owner-occupiers benefit from a flexible, user friendly system providing a high level of indoor air quality.

Developer – Microsoft
Consultant – Shanghai JM Imtech Facility Services


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Mikrotik, Latvia

Underfloor air conditioning supplied for the historic VEF factory redevelopment in Riga, Latvia

Refurbishment

55 Gresham Street

Underfloor air conditioning was specified for the new ninth floor office level so that floor to ceiling height could be maximised, promoting the best architectural vision.

Refurbishment

Mukusalas 42, Latvia

Underfloor air conditioning chosen by Mukusalas Business Centres for tenant flexibility.

Refurbishment

42 Berners Street

Underfloor air conditioning was specified as a means to maximise internal floor to ceiling height, and the final design achieved an extra floor within planning limitations.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.