Case Study

| all |

Mirae Asset

Shanghai

The building has thirty-two floors with six floors offering underfloor air conditioning.

Total Area

75,000 sq m

System
Large AHU and Fantiles

2009 New Build

New build tower housing one of Asia’s leading Financial Services Institutions, Mirae Asset.

The building has thirty-two floors with six floors offering underfloor air conditioning. Each floor is divided into four zones, with one AHU for each floor. A total of 581 Fantile units are supplied.

Developer – Hopson Development Holdings Ltd
Consultant – Ove Arup


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Hammersley House

The 16,311 sq ft building on Warwick Street has been stripped back to the core and has undergone a full redevelopment

Refurbishment

17 Devonshire Square

Full refurbishment of the severely height restricted building located on a prominent corner position of Devonshire Square.

Refurbishment

8 Waterloo Place

A full refurbishment including structural reconfiguration to the central core and installation of new HVAC services. Shortlisted for 2017 BREEAM Awards.

Refurbishment

Here East Innovation Centre

The Here East project announced in 2013 has transformed the former Olympic Press and Broadcast spaces at the Queen Elizabeth Olympic Park into Europe’s biggest technology hub.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.

AET Flexible Space

Advanced Ergonomic Technologies Ltd
The Center, 201 - 203 London Road
East Grinstead
West Sussex
RH19 1HA, UK

+44 (0) 1342 310400

Registered in England No. 2874101
VAT Registration – 602 7742 55

Follow us

Linkedin Twitter YouTube