Case Study

| all |

iQuest Headquarters

Cluj Napoca, Romania

Redevelopment of former Flacăra factory site in Cluj Napoca, creating new Romanian Headquarters for German IT company, iQuest.

Total Area

18,200 sq m

System
CAM-V Underfloor supply air and high level return air

2017 New Build Refurbishment

Redevelopment of former Flacăra factory site in Cluj Napoca creating new Romanian Headquarters for German IT company, iQuest. The phased project commenced in 2015 starting with the addition of two new wings on either side of the factory building.  Phase 2 focused on the 6,000 sq. m office space situated over five floors of the complex and incorporates the underfloor air conditioning system.  The surrounding area features generous green space and is public realm.

The five floors of office space are split into 34 zones, each served by a CAM-V33 or V22 downflow unit, which supply conditioned air into the floor plenum beneath the raised access floor, which is introduced into the workspace by recessed fan air terminals, or Fantiles.  386 standard TU4 Fantiles are installed over the ground to third floors and 98 TUS slim-line Fantiles have been used on the fourth floor which has a shallow floor void.

AET Agent – Convergo Energy

Client – iQuest

Contractor – PadInvest

Designer – Terax

Developer – Taco Developments


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Blackheath High School

Blackheath High School, an independent day school for girls and part of the Girls’ Day School Trust (GDST) network, recently invested £18 million to provide new state of the art facilities including a new library and resource centre.

New Build

One Benjamin Street, London

The new build offers 1692 sq. m. high quality office space with highly flexible, column free floor plates, with internal floor to ceiling heights of 1.8 m.

New Build

Mikrotik, Latvia

Underfloor air conditioning supplied for the historic VEF factory redevelopment in Riga, Latvia

Refurbishment

55 Gresham Street

Underfloor air conditioning was specified for the new ninth floor office level so that floor to ceiling height could be maximised, promoting the best architectural vision.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.