Case Study

| all |

JEBN HQ, Hong Kong

Tai Wai, Hong Kong

Underfloor air conditioning was specified for the 7th floor of the building due to its flexibility and excellence of indoor air quality.

Total Area

1,200 sq m

System
CAM-C Underfloor supply air, underfloor return air

2013 Refurbishment

Food retailer and manufacturer, JEBN Limited moved their headquarters and main food processing facilities to a refurbished building in Tai Wai, Hong Kong.

Underfloor air conditioning was specified for the 7th floor of the building due to its flexibility and excellence of indoor air quality.  CAM-C zonal downflow units’ supply conditioned air into the plenum beneath the Nesite raised access floor and this is introduced into the workspace by 90 TU4 Fantile units.  Additional fresh air modules have been supplied which introduce external fresh air into the system and the whole system is controlled using Flexvisor IP software.

Client – JEBN Group Headquarters

MEP Services – Asian European Engineering


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Mikrotik, Latvia

Underfloor air conditioning supplied for the historic VEF factory redevelopment in Riga, Latvia

Refurbishment

55 Gresham Street

Underfloor air conditioning was specified for the new ninth floor office level so that floor to ceiling height could be maximised, promoting the best architectural vision.

Refurbishment

Mukusalas 42, Latvia

Underfloor air conditioning chosen by Mukusalas Business Centres for tenant flexibility.

Refurbishment

42 Berners Street

Underfloor air conditioning was specified as a means to maximise internal floor to ceiling height, and the final design achieved an extra floor within planning limitations.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.