Case Study

| all |

JEBN HQ, Hong Kong

Tai Wai, Hong Kong

Underfloor air conditioning was specified for the 7th floor of the building due to its flexibility and excellence of indoor air quality.

Total Area

1,200 sq m

System
CAM-C Underfloor supply air, underfloor return air

2013 Refurbishment

Food retailer and manufacturer, JEBN Limited moved their headquarters and main food processing facilities to a refurbished building in Tai Wai, Hong Kong.

Underfloor air conditioning was specified for the 7th floor of the building due to its flexibility and excellence of indoor air quality.  CAM-C zonal downflow units’ supply conditioned air into the plenum beneath the Nesite raised access floor and this is introduced into the workspace by 90 TU4 Fantile units.  Additional fresh air modules have been supplied which introduce external fresh air into the system and the whole system is controlled using Flexvisor IP software.

Client – JEBN Group Headquarters

MEP Services – Asian European Engineering


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

42 Berners Street

Underfloor air conditioning was specified as a means to maximise internal floor to ceiling height, and the final design achieved an extra floor within planning limitations.

Cat-A fit-out redevelopment UfAC

ICBC Headquarters, Beijing

The largest commercial bank in China, the Industrial and Commercial Bank of China Limited (ICBC) has adopted the concept of underfloor air conditioning.

New Build

BMW China Services, Shanghai

Fantile units were supplied for the BMW office areas to enhance air conditioning performance.

New Build

41 Lothbury

Fully redeveloped in 2004, the building offers a blend of contemporary office accommodation with historical period features.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.