You searched for did-year-news — Page 2 of 2 — AET Flexible Space
Search

Historic 196 Deansgate in Manchester Adopts Under Floor Air Conditioning

…In 2016, developer Commercial Estates Group invested £2.3 million into the refurb of the reception, first and second floors and recently they secured a five year lease for 4,650 sq. ft. on the fourth floor for Marketing Communications Agency, McCann Manchester. CEG hosted an official building launch in early October….
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Underfloor Air Conditioning Fit-out at Hanover Street

AET Flexible Space, underfloor air conditioning specialists have just completed a Cat-B Fit-out of the first floor at 11-12 Hanover Street for incoming tenant, Canadian property investor, Quadreal. The underfloor system at the prominently positioned Mayfair offices was originally installed in the year 2000 for Japanese construction company Teisei and…
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

UfAC at 20 Soho Square on Track to Improve User Wellbeing

…however the property achieved notoriety in Q1 2016 by being rated the fourth biggest property transaction by size when Palantir Technologies UK Ltd acquired the whole 64,606 ft2 on a ten year lease at an average rent of £74 per ft2. The incoming tenant has opted to finalise the fit…
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Comfort Cooling for Blackheath High School

…underfloor void within the main resource area, requiring special modification to the CAM baseframe and raised floor substructure. The new state of the art facility reached practical completion over the summer of 2018 and was ready for students to use in September at the start of the new school year….
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Underfloor Air Conditioning fits the bill at 8 Waterloo Place

…space, an enlarged reception and alterations to the top storey to create a roof terrace. The building was also shortlisted for the 2017 BREEAM awards, refurbishment category and Chinese restaurant giant Imperial Treasure has secured 8500 sq. ft. of mezzanine, ground and basement floors on a 25 year lease deal….
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Oak Finish Raised Flooring for No.1 Cavendish Place by AET Flexible Space

AET Flexible Space leading manufacturer and supplier of Under Floor Air Conditioning (UfAC) systems originally supplied 1500 m2 of high specification Nesite Raised Access flooring over four floors at No. 1 Cavendish Place in 2001, in conjunction with AET Flexible Space air conditioning equipment. This year AET have re-supplied the…
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

First Point Building, Gatwick

…BAA Lynton’s former Associate Director Alistair Taylor discussing the application of the Flexible Space system at First Point, Gatwick In 2015 AET have returned to First Point to conduct system surveys and carry out equipment upgrades. Read the latest news here… First Point Building, Gatwick First Point Building, Gatwick 2…
(Search hits: 0 in body, 0 in title. Relevance score: 106.5)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.