You searched for did-year-news — AET Flexible Space
Search

AET Newsletter August 2021

…able to continue working to deliver our underfloor air conditioning systems to our growing project portfolio. Award winning innovation We were thrilled to finish off 2020 with some great news, that we had won the ‘Retrofit Project of the Year’ at the H&V News Awards for our work on the…
(Search hits: 8 in body, 0 in title. Relevance score: 2129.79)

AET sponsors the BD Architect of the Year Awards

AET Flexible Space, leading provider of Under Floor Air Conditioning systems is proudly sponsoring the Refurbishment Architect of the Year category at this year’s prestigious BD Architect of the Year Awards 2017. Launched in 2004 and organised by Building Design, the BD Architect of the Year Awards distinguishes architectural practices,…
(Search hits: 5 in body, 1 in title. Relevance score: 1756.78)

AET Newsletter December 2019

…contractor partners on these projects and will share further updates as the installations progress.   AET in the news AET provides a flexible and high-performing underfloor air conditioning system at the One Benjamin development – Builders’ Merchant News New underfloor AC system for London development – ACR News Underfloor solution…
(Search hits: 6 in body, 0 in title. Relevance score: 1597.46)

News

news/…
(Search hits: 0 in body, 1 in title. Relevance score: 1304.59)

24 St James’s Square

…project has already won the “Best Office Architecture London” award at the 2019 International Property Awards and has very recently been awarded ‘Retrofit Project of the Year’ at the H&V News Awards 2020. The building is being let as Grade A office space by BNP Paribas Real Estate who advised…
(Search hits: 2 in body, 0 in title. Relevance score: 1064.84)

The Gilbert & One Lackington

…systems were originally installed on the 1st, 2nd, 3rd, 4th, and 5th floors as part of a major refurbishment works which were completed in 2001 shortly after the building became the European Headquarters for media giant Bloomberg. Later that year the building was awarded the BCO’s Fit Out Workplace of…
(Search hits: 2 in body, 0 in title. Relevance score: 1064.72)

Fitout & Maintenance

…Commissioning – to verify system performance against the design and specification. Full surveys of the underfloor plenum to identify problem areas which may affect system operation Service plans from 1 year to 3 years Spare parts and additional or replacement units AC to EC fan upgrades for CAM downflow units…
(Search hits: 1 in body, 0 in title. Relevance score: 931.63)

Privacy Policy

years. Accounts Purchasing and accounts information is retained for a period of six years following the end of the financial year during which the purchase has been made. It is our legal obligation to keep these records for tax purposes. Your Rights You have the right to ask us not…
(Search hits: 1 in body, 0 in title. Relevance score: 931.63)

Under Floor Air for Surrey University

…900 users, 600,000 books and 72,000 e-books, benefits from the use of AET’s innovative air conditioning system all year round. The client’s brief was to incorporate an air conditioning system for the new 4,950 m² four-storey extension to the University Library that was easy to maintain and reconfigure using on-site…
(Search hits: 3 in body, 0 in title. Relevance score: 798.63)

Jaguar Land Rover Design Centre

…BIFM “Office of the Year” awards 13 The building has over 40 zones with AET Flexible Space CAM-C25 and CAM C-35 downflow units supplying conditioned air into the plenum beneath the raised access floor. Conditioned air is introduced into the work space by more than 750 Fantile units. The site…
(Search hits: 1 in body, 0 in title. Relevance score: 638.83)

20 Soho Square, London

…floor plates and a roof terrace with views looking out over London. The property achieved notoriety in Q1 2016 by being rated the fourth biggest property transaction in London by size when Palantir Technologies UK Ltd acquired the whole 64,606 ft2 on a ten-year lease. The project was delivered as…
(Search hits: 1 in body, 0 in title. Relevance score: 638.83)

Sustainable Flexible Cooling for MAF Properties Headquarters

…and the owner occupiers declared that the investment in managing resources and operations was recovered in one year highlighting the long term financial benefits of being sustainable. In a statement of satisfaction about AET Flexible Space system, MAF Properties comment on the good year round performance, and quoted, “It is…
(Search hits: 2 in body, 0 in title. Relevance score: 532.36)

Air Conditioning Commercial Office Space

…comparison with ceiling based services, deriving that floor level services offer a number of benefits. AET have supplied underfloor systems to buildings worldwide since the early 1990’s, and some 25 years later, still maintain some of their original UfAC installations in the UK. These buildings and the internal spatial requirements…
(Search hits: 2 in body, 0 in title. Relevance score: 532.36)

Specifying a Low Level Services Strategy

…space floor area, whilst maximising headroom with a restrictive 2.8m slab to underside slab height. Over the phased twelve year refurbishment, the system has proved to be adaptable and flexible for the multi-tenanted building, easily accommodating increasing cooling load requirements through higher density and occupant demand at Cat-B fit-out stage….
(Search hits: 2 in body, 0 in title. Relevance score: 532.36)

7 Soho Square

…Underfloor air conditioning was specified for the fit-out of the vacant fourth floor at 7 Soho Square to provide additional comfort cooling when TripAdvisor secured a ten year lease in 2012. The 1615 sq. m floor area is air conditioned by a single CAM-C unit with direct expansion coils and…
(Search hits: 1 in body, 0 in title. Relevance score: 532.36)

11-12 Hanover Street

Underfloor air conditioning and Nesite raised access flooring was supplied to this building in the year 2000 as part of a full refurbishment for Japanese developer, Taisei. The building is situated in the heart of Mayfair in a prominent location on the corner of Hanover Street and Pollen Street and…
(Search hits: 1 in body, 0 in title. Relevance score: 532.36)

Hammersley House

…off in the first year on installations up to £1 Million. Normally raised access floor attracts around 6% relief per annum but using it as a floor plenum(a duct) it changes its status from Fixture to plant and equipment thus attracting the enhanced Capital Allowance. The project was developed under…
(Search hits: 1 in body, 0 in title. Relevance score: 532.36)

Plenum Air Conditioning for Refurbishment and Retrofit Projects

year. The iconic building with its unusual floor plate shape has been fully refurbished over a twelve year period by Commercial Estates Group and AET Flexible Space equipment was originally specified as an option that would bring cooling to the inner areas of each deep space floor area, whilst maximising…
(Search hits: 2 in body, 0 in title. Relevance score: 532.36)

Comfort Cooling at Tricorn House, Birmingham

Under Floor Air Conditioning has proved to be a flexible and modular approach for a phased refurbishment running over a twelve year period. The iconic Tricorn House building; constructed in the 1970’s and situated on the Hagley Road in Birmingham dominates the local skyline and features a highly unusual floor…
(Search hits: 1 in body, 0 in title. Relevance score: 319.41)

Underfloor Air Conditioning Upgrade for Avaya Fit Out

…office space did not permit full building installation of underfloor air conditioning, but it was deemed appropriate to serve the Atrium area. The fit-out works for Avaya were carried out by main contractor, Realys, and AET worked with M&E contractor, AMD Environmental on the recent project. The 2017 upgrade was…
(Search hits: 1 in body, 0 in title. Relevance score: 266.28)

AET Newsletter March 2020

years ago, and it was great to hear that they were so pleased with the system that they wanted to update it and include it in the £60m refurbishment. I wish everyone a safe and swift return to normality, and hope that our journey over the coming months will be…
(Search hits: 1 in body, 0 in title. Relevance score: 266.24)

Energy Efficient Cooling for Students at the University of Essex

…The £16.5 million project is the largest building to be constructed at the Colchester campus since 1965 and was completed during the summer of 2015 ready for occupation at the start of the new academic year. The Patel Taylor design hopes to achieve a sustainability goal of BREEAM Very Good….
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Sir William Perkin Sixth Form Centre opts for UfAC

…the Fatronic controller integrated into each fan terminal unit. The order was placed in February 2015 and delivery of AET equipment was completed in August. Phase II construction will commence on site immediately and is due to completed by the end of the year ready for the 2016 Spring Term….
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

33 Glasshouse Street Refurbished with Under Floor Air Conditioning

AET Flexible Space, leading provider of underfloor air conditioning has recently completed commissioning 33 Glasshouse Street in London after supplying to Emico early this year. The building features a Grade II Listed façade and is located in a prominent position looking over Regent Street and the Soho area of the…
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Prestigious New Build in Ghana Chooses Under Floor Air Conditioning

…The project is due for completion this year and AET Flexible Space engineers have travelled to Ghana for commissioning of the UfAC equipment. Flexible office space from 450m2 at Ghana’s most prestigious address will be available. One Airport Square, Accra, the first building in Ghana to feature Under Floor Air…
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Green Light for Underfloor Air Conditioning in Romania

…been under construction since 2015, the first phase transforming the former factory building by adding two new wings on each side. The second phase creating the grade-A office space is nearly complete and iQuest intends move its Cluj Napoca workforce into the new building by the end of the year….
(Search hits: 1 in body, 0 in title. Relevance score: 266.18)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.