Case Study

| all |

Kuwait State Audit Bureau

Kuwait City, Kuwait

$93 Million New Build Headquarters Complex for the Kuwait Government National State Audit Bureau

Total Area

50,000 sq m

System
CAM-C Underfloor supply air, underfloor return air

2006 New Build

The State Audit Bureau of Kuwait manages and monitors public funds on behalf of the Kuwait Government and National Assembly. The high profile client demanded state of the art technology including flexible underfloor HVAC services. This is the first building in Kuwait to feature AET Flexible Space underfloor air conditioning and a major achievement for the MEP contractor. The high specification new build complex comprises three ten-storey buildings linked by a full height Atria and Sky gardens, 33,000 sq m state of the art office space, IT based auditing facilities, a conference centre, training facilities, library and cafeteria, and 22,000 sq m car parking facilities. The building facade is fronted by a spectacular 90m long and 36m high curved glass fronted perimeter wall which permits exciting views into the building.

Developer – State Audit Bureau, Kuwait
Architect/Consultant – John S. Bonnington
M&E Contractor – Emcor Drake & Scull


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

55 Gresham Street

Underfloor air conditioning was specified for the new ninth floor office level so that floor to ceiling height could be maximised, promoting the best architectural vision.

Refurbishment

Mukusalas 42, Latvia

Underfloor air conditioning chosen by Mukusalas Business Centres for tenant flexibility.

Refurbishment

42 Berners Street

Underfloor air conditioning was specified as a means to maximise internal floor to ceiling height, and the final design achieved an extra floor within planning limitations.

Refurbishment

ICBC Headquarters, Beijing

The largest commercial bank in China, the Industrial and Commercial Bank of China Limited (ICBC) has adopted the concept of underfloor air conditioning.

New Build

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.