You searched for daman_text-media — AET Flexible Space
Search

Daman Tower Dubai

…3 Dubai 2013 52,000 sq m AET Flexible Space CAM-V Underfloor supply air, high level return air 19 528 Daman Tower Dubai 527 Daman Tower Dubai 529 Daman Tower Dubai Developer – Daman Investments Architect – Perkins & Will Consultant – Buro Happold Contractor – Habtoor Leighton 527 528 529…
(Search hits: 1 in body, 1 in title. Relevance score: 1917.76)

Daman Tower in Dubai adopts AET under floor air conditioning

The impressive 52,000 sq m Burj Daman in Dubai, part of the “Buildings by Daman” project at the Dubai International Finance Centre and incorporating AET Flexible Space under floor air conditioning, was completed at the end of 2013 and commercial space is now sold out. The twenty storey tower comprises…
(Search hits: 3 in body, 1 in title. Relevance score: 1065.42)

Terms And Conditions

…You must not modify the paper or digital copies of any materials you have printed off or downloaded in any way, and you must not use any illustrations, photographs, video or audio sequences or any graphics separately from any accompanying text. Our status (and that of any identified contributors) as…
(Search hits: 1 in body, 0 in title. Relevance score: 932.07)

Privacy Policy

…to use our site, subscribe to our service, search for a product, place an order with us, participate in discussion boards or other social media functions on our site, enter a competition, promotion or survey, and when you report a problem with our site. The information you give us may…
(Search hits: 1 in body, 0 in title. Relevance score: 931.9)

Home

2062 Alt text 1 2068 Alt text 2 2069 Alt text 3 1986 Alt text 4 6 AET Flexible Space underfloor air conditioning: less waste, a better space Create adaptable quality workspace Sustainable, modular and energy efficient HVAC Comfort cooling for people in commercial offices and workspace 1990 Multi award…
(Search hits: 0 in body, 0 in title. Relevance score: 745.66)

University of Essex

Underfloor air conditioning was specified for the £16.5 million new build development at the University of Essex’ Colchester campus; the largest new building on campus since 1965 providing an integrated learning centre, library extension, media centre and council board room. The ventilation system was to provide low energy comfort cooling…
(Search hits: 1 in body, 0 in title. Relevance score: 639.02)

The Gilbert & One Lackington

…systems were originally installed on the 1st, 2nd, 3rd, 4th, and 5th floors as part of a major refurbishment works which were completed in 2001 shortly after the building became the European Headquarters for media giant Bloomberg. Later that year the building was awarded the BCO’s Fit Out Workplace of…
(Search hits: 1 in body, 0 in title. Relevance score: 532.51)

AET Newsletter March 2020

…in Winter 2020. Originally designed by Frederick Gould and Giles Gilbert Scott, and built in 1930, Citygate House was later taken over by the media giant, Bloomberg. Bloomberg’s 2002 refurbishment of the building won the BCO Best Fit-Out of Workplace Award. AET’s underfloor air conditioning system was first introduced into…
(Search hits: 1 in body, 0 in title. Relevance score: 266.26)

CAM-V Zonal System

…for areas unsuitable, or with inadequate space for recessed terminals. The unit is positioned over an opening in the raised floor, extracts conditioned air from the plenum and delivers it into the space. Add more detail in accordance with Fantile text? Controls Units Units Components Components Controls Controls Units cam-v/…
(Search hits: 0 in body, 0 in title. Relevance score: 186.41)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.