You searched for sitemap-pvt-page-2015-zd.hotel — AET Flexible Space
Search

Solar Panels and Collectors

Please visit our dedicated site http://www.camel-solar.com Store energy the Camel Solar way with new PVT panels HAVE YOU CONSIDERED installing solar PV panels on your roof? It makes more sense now than ever with new Camel PVT collectors. These produce 20% more electricity than conventional PV Solar Panels plus three…
(Search hits: 5 in body, 0 in title. Relevance score: 4661.23)

Terms And Conditions

…201-203 London Road, East Grinstead, West Sussex, RH19 1HA. Our main trading address is The Center, 201-203 London Road, East Grinstead, West Sussex, RH19 1HA. Our VAT number is 602 7742 55. Changes To These Terms We may revise these terms of use at any time by amending this page….
(Search hits: 5 in body, 0 in title. Relevance score: 4659.85)

The Hoxton (Wedge House)

The Hoxton, Southwark, is an ambitious new refurbishment of a former social security office located on London’s south bank. The Hoxton Hotel incorporates 192 hotel rooms, restaurants, bars and function rooms, as well as 4,000 m2 of flexible co-working office space, the all within a sleek and contemporary building. The…
(Search hits: 5 in body, 0 in title. Relevance score: 2875.15)

Privacy Policy

…from our site (including date and time); products you viewed or searched for; page response times, download errors, length of visits to certain pages, page interaction information (such as scrolling, clicks, and mouse-overs), and methods used to browse away from the page and any phone number used to call our…
(Search hits: 3 in body, 0 in title. Relevance score: 2795.91)

Cookie Policy

…update a unique value for each page visited. (Expiry after 24 hours) Functionality cookies These are used to recognise you when you return to our website. This enables us to personalise our content for you, greet you by name and remember your preferences (for example, your choice of language or…
(Search hits: 1 in body, 0 in title. Relevance score: 931.97)

Nina Tower

…incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space This Mega Project became a new landmark of Hong Kong in 2008. A total of 131 Floors in the Two Towers incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space AET…
(Search hits: 1 in body, 0 in title. Relevance score: 745.41)

Centrica

Part of a major redevelopment of a dilapidated area in the Western area of Aberdeen. The Justice Mill Lane project comprises grade-A commercial office space at The IQ building, a high quality business hotel and underground parking. The 13,766 sq m building offers large flexible floor plates and an impressive…
(Search hits: 1 in body, 0 in title. Relevance score: 638.92)

First Point Building, Gatwick

…rental income. In 2015 AET returned to First Point to carry out equipment upgrades. 20 13 Flexible Space Under Floor Air Conditioning was specified for this new build development originally completed in 1998 after BAA Lynton carried out a feasibility study, comparing underfloor air conditioning against ceiling based air conditioning…
(Search hits: 1 in body, 0 in title. Relevance score: 638.88)

Film House, 142 Wardour Street

…7-storey hotel. London, UK 2008 | 2012 3065 sq. m CAM-V + CAM-C Direct Expansion 1848 1851 1850 1847 Consultant – Flatt Consulting | Taylor Project Services | Watkins Payne Partnership Main Contractor – I4 Interiors | Orchard Build M&E Contractor – Envirotech Services | MB Air | LSC Building…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Bridge House

…London Bridge, Bridge House, was originally built in 1832 as a hotel, and subsequently altered in the 1960s with a rear annex added in the 1970s. The refurbishment of the building was led by award winning Emrys Architects, who obtained planning consent to remove the 1960s rooflights, create new windows,…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

BMW China Services, Shanghai

Leading car manufacturer BMW have recently moved into new offices in one of the mixed-use buildings at the White Magnolia Plaza, Shanghai. The mixed use development consists of a 320m office high rise, a hotel tower as well as a series of smaller scale buildings. The complex is part of…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

UfAC for Centrica Energy Aberdeen Headquarters

…Justice Mill Lane project, comprising grade A office accommodation, a high quality business hotel and underground parking. The development was completed at the end of 2010 and within months two leading energy companies had secured tenancies in the IQ building equally sharing the 13,766 m2 office accommodation. The IQ Building…
(Search hits: 2 in body, 0 in title. Relevance score: 532.42)

iQuest Headquarters

Redevelopment of former Flacăra factory site in Cluj Napoca creating new Romanian Headquarters for German IT company, iQuest. The phased project commenced in 2015 starting with the addition of two new wings on either side of the factory building. Phase 2 focused on the 6,000 sq. m office space situated…
(Search hits: 1 in body, 0 in title. Relevance score: 532.4)

Avaya – 1000 Cathedral Hill

…of 25 TU4 Fantiles to serve two zones in the atrium area. In 2015-16, the three buildings were acquired by Ediston Real Estate and Europa Capital, the combined property totalling 15,000-20,000 sq.ft floorplates. AET supplied like for like equipment to building 1000 as part of a full refurbishment of the…
(Search hits: 1 in body, 0 in title. Relevance score: 532.4)

Flexible Space Distribution

…( Bahrain ) LLC Gekkold 109383, Moscow, Batyuninsky Proezd, 41, building 3 55.6599905 37.70669669999995 +7 (495) 640-98-10 http://www.gekkold.com/ 1117 Golvbolaget Stockholm AB Solkraftsvägen 16 A, 135 70 Stockholm, Sweden 59.23847509999999 18.1926373 Mr Peter Schering peter.schering@golvbolaget.se +46 (0)87 18 26 00 http://www.golvbolaget.se/ 1118 Air Solutions International Pty Ltd Suite 405, 20…
(Search hits: 0 in body, 0 in title. Relevance score: 372.7)

Parkview Green FangCao Di

…Archicreation January 2015 Parkview Green FangCaoDi, CIBSE Sep 2012 Parkview Green FangCao Di Parkview Green FangCao Di Parkview Green FangCao Di 4 Beijing, China 2008 82,000 sq m A-Grade Office Space and a Boutique Hotel Hybrid system with Chilled Ceilings and Fantiles 19 511 510 512 509 Parkview Green FangCao…
(Search hits: 0 in body, 0 in title. Relevance score: 319.45)

Savile Row Refurbishment Overcomes Height Restrictions with AET Flexible Space

…heat pumps installed on external platforms adjacent to each floor. The Nesite raised access floor supplied by AET created a luxury interior with brushed and oiled teak timber finish. Completed in spring 2015, the building is already fully let; underlying the quality and prime location of the grade A space….
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Green Light for Underfloor Air Conditioning in Romania

…efficiency and the whole system is connected together and communicates with the main BMS via the bespoke AET flexgateway module. The phased project has been under construction since 2015, the first phase transforming the former factory building by adding two new wings on each side. The second phase creating the…
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Sir William Perkin Sixth Form Centre opts for UfAC

…the Fatronic controller integrated into each fan terminal unit. The order was placed in February 2015 and delivery of AET equipment was completed in August. Phase II construction will commence on site immediately and is due to completed by the end of the year ready for the 2016 Spring Term….
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Energy Efficient Cooling for Students at the University of Essex

…satisfy their requirements for a flexible and comfortable indoor environment suitable for high and transient occupancy. The £16.5 million project is the largest building to be constructed at the Colchester campus since 1965 and was completed during the summer of 2015 ready for occupation at the start of the new…
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Resources

…solutions. Heat Interface Units https://www.flexiblespace.com/hiu/ 1470 1 Camel Solar We are able to offer the highest efficiency Solar Thermal Collectors and the latest technology in Solar PVT (Water cooled Solar PV for high efficiency) Solar Thermal Collectors http://www.camel-solar.com/cs/ 2087 1 Controls Fatronic Flexmatic Flexmatic Touch FlexTouch Flexgateway-Flexvisor 1388 Components FSS…
(Search hits: 0 in body, 0 in title. Relevance score: 186.45)

Frequently Asked Questions

The AET Flexible Space FAQ page will answer many of the most common questions you have about UfAC…
(Search hits: 0 in body, 0 in title. Relevance score: 186.39)

196 Deansgate, Manchester

…CAM-C Underfloor supply air, underfloor return air 83 196 Deansgate, Manchester 82 196 Deansgate, Manchester 80 196 Deansgate, Manchester Architect – Buttress Consultant – Troup Bywater & Anders Developer – Commercial Estates Group M & E Contractor – Oakwood Air Conditioning 18 2008 / 2015 492 196 Deansgate, Manchester 81…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

28 Savile Row, Mayfair

…Savile Row 3 London, UK 2,300 sq m CAM-C system integrated with 2-pipe heat pumps Underfloor supply air, underfloor return air 297 332 333 Architect – Denton Corker Marshall Consultant – Waterman Developer – Allied London M & E Contractor – ARJ Construction 957 18 2015 297 902 333 casestudy/28-savile-row-mayfair/…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

University of Essex

…project had a sustainability goal of BREEAM Very Good.   University of Essex University of Essex University of Essex University of Essex 4 Colchester, UK 2015 6,200 sq m CAM-V Underfloor supply air and high level return air 19 501 502 503 504 Architect – Patel Taylor Consultant – Mott…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

Sir William Perkin’s School: Bridge Studios

…adapt to future change of use within the space. Chertsey, Surrey 2015 378 CAM-V Underfloor supply air and high level return air 1777 1774 1778 1775 1776 1779 Architect – IID Architects Consultant – The Brinkfell Partnership Main Contractor – Lifebuild Construction M & E Contractor – Industrial Pipe Services…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.