You searched for sitemap-pvt-post-2002-zd.hotel — AET Flexible Space
Search

Solar Panels and Collectors

Please visit our dedicated site http://www.camel-solar.com Store energy the Camel Solar way with new PVT panels HAVE YOU CONSIDERED installing solar PV panels on your roof? It makes more sense now than ever with new Camel PVT collectors. These produce 20% more electricity than conventional PV Solar Panels plus three…
(Search hits: 5 in body, 0 in title. Relevance score: 4661.23)

The Hoxton (Wedge House)

The Hoxton, Southwark, is an ambitious new refurbishment of a former social security office located on London’s south bank. The Hoxton Hotel incorporates 192 hotel rooms, restaurants, bars and function rooms, as well as 4,000 m2 of flexible co-working office space, the all within a sleek and contemporary building. The…
(Search hits: 5 in body, 0 in title. Relevance score: 2875.15)

Nina Tower

…incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space This Mega Project became a new landmark of Hong Kong in 2008. A total of 131 Floors in the Two Towers incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space AET…
(Search hits: 1 in body, 0 in title. Relevance score: 745.41)

180 Great Portland Street

…of indoor air quality. AET’s flexible underfloor UfAC solution allowed for a minimum floor plenum of 200mm. This maximised the floor to ceiling height, and post refurbishment enabled a 35% increase in total occupancy. Sustainability played an important role in the brief, with the specification of the building services having…
(Search hits: 1 in body, 0 in title. Relevance score: 639.06)

Centrica

Part of a major redevelopment of a dilapidated area in the Western area of Aberdeen. The Justice Mill Lane project comprises grade-A commercial office space at The IQ building, a high quality business hotel and underground parking. The 13,766 sq m building offers large flexible floor plates and an impressive…
(Search hits: 1 in body, 0 in title. Relevance score: 638.92)

16-18 Kirby Street

1960’s post war building fully refurbished 2006. Architect, BuckleyGrayYeoman specified innovative silicon fixed flush-faced glazing formed a series of projecting ‘picture frames’ for each floor, integrating building signage, access and services. The building was also enlarged and remodelled as part of the redevelopment with extensions to the basement, ground, first…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

10 St Giles Square

…as the most suitable HVAC solution as it allowed the project team to preserve and highlight the remarkable cantilevered roof. This very light concrete roof is set on a post-tensioned structure which allows the building to span over St Giles High Street below. Using an underfloor air conditioning system meant…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

AET Newsletter March 2020

…in Winter 2020. Originally designed by Frederick Gould and Giles Gilbert Scott, and built in 1930, Citygate House was later taken over by the media giant, Bloomberg. Bloomberg’s 2002 refurbishment of the building won the BCO Best Fit-Out of Workplace Award. AET’s underfloor air conditioning system was first introduced into…
(Search hits: 2 in body, 0 in title. Relevance score: 532.47)

The Gilbert & One Lackington

…the year 2002. A total of 8 CAM-C units were installed around the perimeter of each floor plate providing 24-hour cooling to the densely populated office floors, which in turn were served by AET’s standard TU4 Fantile™ units and slim line TU3 units on the 4th and 5th floors, due…
(Search hits: 1 in body, 0 in title. Relevance score: 532.47)

BMW China Services, Shanghai

Leading car manufacturer BMW have recently moved into new offices in one of the mixed-use buildings at the White Magnolia Plaza, Shanghai. The mixed use development consists of a 320m office high rise, a hotel tower as well as a series of smaller scale buildings. The complex is part of…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Film House, 142 Wardour Street

…7-storey hotel. London, UK 2008 | 2012 3065 sq. m CAM-V + CAM-C Direct Expansion 1848 1851 1850 1847 Consultant – Flatt Consulting | Taylor Project Services | Watkins Payne Partnership Main Contractor – I4 Interiors | Orchard Build M&E Contractor – Envirotech Services | MB Air | LSC Building…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Bridge House

…London Bridge, Bridge House, was originally built in 1832 as a hotel, and subsequently altered in the 1960s with a rear annex added in the 1970s. The refurbishment of the building was led by award winning Emrys Architects, who obtained planning consent to remove the 1960s rooflights, create new windows,…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Flexible Space Distribution

…( Bahrain ) LLC Gekkold 109383, Moscow, Batyuninsky Proezd, 41, building 3 55.6599905 37.70669669999995 +7 (495) 640-98-10 http://www.gekkold.com/ 1117 Golvbolaget Stockholm AB Solkraftsvägen 16 A, 135 70 Stockholm, Sweden 59.23847509999999 18.1926373 Mr Peter Schering peter.schering@golvbolaget.se +46 (0)87 18 26 00 http://www.golvbolaget.se/ 1118 Air Solutions International Pty Ltd Suite 405, 20…
(Search hits: 0 in body, 0 in title. Relevance score: 372.7)

Underfloor Air Conditioning Upgrade for 16-18 Kirby Street

AET Flexible Space have just completed a full upgrade of the underfloor air conditioning system on the first floor of 16-18 Kirby Street, occupied by creative agency 7Fold. The 26,000 sq. ft., 1960’s post war building was fully refurbished in 2006, enlarged and remodelled by Architect, Buckley Gray Yeoman, with…
(Search hits: 1 in body, 0 in title. Relevance score: 266.28)

Air Conditioning Commercial Office Space

…zone can be operated with autonomy, but it is the inherent flexibility of the system that can futureproof a building for the specifier. A British Council of Offices (BCO) report published in 2002, “Sustainable buildings are better business, can we deliver them together?” compares various air conditioning options over a…
(Search hits: 1 in body, 0 in title. Relevance score: 266.23)

Specifying a Low Level Services Strategy

…huge cash paybacks. Underfloor systems are deemed to be sustainable. Employing modular equipment and zoned layouts, each zone can be operated with autonomy, but it is the inherent flexibility of the system that can futureproof a building for the specifier. A British Council of Offices (BCO) report published in 2002,…
(Search hits: 1 in body, 0 in title. Relevance score: 266.23)

UfAC at 20 Soho Square on Track to Improve User Wellbeing

…21 next door. In 1924-6, the original building was demolished and re-built by Cross and Blackwell as their headquarters building. In 2002, the owner developer increased the building’s gross floor area by 16% by adding a new top floor on the roof of the existing rear extension. At the same…
(Search hits: 1 in body, 0 in title. Relevance score: 266.23)

UfAC for Centrica Energy Aberdeen Headquarters

…Justice Mill Lane project, comprising grade A office accommodation, a high quality business hotel and underground parking. The development was completed at the end of 2010 and within months two leading energy companies had secured tenancies in the IQ building equally sharing the 13,766 m2 office accommodation. The IQ Building…
(Search hits: 1 in body, 0 in title. Relevance score: 266.22)

Resources

…solutions. Heat Interface Units https://www.flexiblespace.com/hiu/ 1470 1 Camel Solar We are able to offer the highest efficiency Solar Thermal Collectors and the latest technology in Solar PVT (Water cooled Solar PV for high efficiency) Solar Thermal Collectors http://www.camel-solar.com/cs/ 2087 1 Controls Fatronic Flexmatic Flexmatic Touch FlexTouch Flexgateway-Flexvisor 1388 Components FSS…
(Search hits: 0 in body, 0 in title. Relevance score: 186.45)

Flax House, Belfast

…floor with a different tenant, and including modern, tech-focused firms which the developer has looked to attract. Belfast, UK 2018 2,657 sq. m CAM-C Direct Expansion: underfloor supply air, underfloor return air 2002 2003 2005 2004 2006 Architect – GMR Architects Developer – Straidorn Properties M&E Consultant – Bailie Associates…
(Search hits: 0 in body, 0 in title. Relevance score: 106.49)

No.1 Cavendish Place

…cost advantages over the life of the building.”   3 Marylebone, London, UK 2002 2136 m2 CAM-C – floor supply, low-level return 18 522 No.1 Cavendish Place 523 No.1 Cavendish Place 524 No.1 Cavendish Place Architect – EPR Architects Consultant – PSM Project Services & Management Developer – O&H Properties…
(Search hits: 0 in body, 0 in title. Relevance score: 106.49)

Parkview Green FangCao Di

…Archicreation January 2015 Parkview Green FangCaoDi, CIBSE Sep 2012 Parkview Green FangCao Di Parkview Green FangCao Di Parkview Green FangCao Di 4 Beijing, China 2008 82,000 sq m A-Grade Office Space and a Boutique Hotel Hybrid system with Chilled Ceilings and Fantiles 19 511 510 512 509 Parkview Green FangCao…
(Search hits: 0 in body, 0 in title. Relevance score: 106.49)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.