You searched for sitemap-pvt-post-2016-zd.hotel — AET Flexible Space
Search

Solar Panels and Collectors

Please visit our dedicated site http://www.camel-solar.com Store energy the Camel Solar way with new PVT panels HAVE YOU CONSIDERED installing solar PV panels on your roof? It makes more sense now than ever with new Camel PVT collectors. These produce 20% more electricity than conventional PV Solar Panels plus three…
(Search hits: 5 in body, 0 in title. Relevance score: 4661.23)

The Hoxton (Wedge House)

The Hoxton, Southwark, is an ambitious new refurbishment of a former social security office located on London’s south bank. The Hoxton Hotel incorporates 192 hotel rooms, restaurants, bars and function rooms, as well as 4,000 m2 of flexible co-working office space, the all within a sleek and contemporary building. The…
(Search hits: 5 in body, 0 in title. Relevance score: 2875.15)

Nina Tower

…incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space This Mega Project became a new landmark of Hong Kong in 2008. A total of 131 Floors in the Two Towers incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space AET…
(Search hits: 1 in body, 0 in title. Relevance score: 745.41)

20 Soho Square, London

…floor plates and a roof terrace with views looking out over London. The property achieved notoriety in Q1 2016 by being rated the fourth biggest property transaction in London by size when Palantir Technologies UK Ltd acquired the whole 64,606 ft2 on a ten-year lease. The project was delivered as…
(Search hits: 1 in body, 0 in title. Relevance score: 745.36)

180 Great Portland Street

…of indoor air quality. AET’s flexible underfloor UfAC solution allowed for a minimum floor plenum of 200mm. This maximised the floor to ceiling height, and post refurbishment enabled a 35% increase in total occupancy. Sustainability played an important role in the brief, with the specification of the building services having…
(Search hits: 1 in body, 0 in title. Relevance score: 639.06)

Centrica

Part of a major redevelopment of a dilapidated area in the Western area of Aberdeen. The Justice Mill Lane project comprises grade-A commercial office space at The IQ building, a high quality business hotel and underground parking. The 13,766 sq m building offers large flexible floor plates and an impressive…
(Search hits: 1 in body, 0 in title. Relevance score: 638.92)

10 St Giles Square

…as the most suitable HVAC solution as it allowed the project team to preserve and highlight the remarkable cantilevered roof. This very light concrete roof is set on a post-tensioned structure which allows the building to span over St Giles High Street below. Using an underfloor air conditioning system meant…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

16-18 Kirby Street

1960’s post war building fully refurbished 2006. Architect, BuckleyGrayYeoman specified innovative silicon fixed flush-faced glazing formed a series of projecting ‘picture frames’ for each floor, integrating building signage, access and services. The building was also enlarged and remodelled as part of the redevelopment with extensions to the basement, ground, first…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

Film House, 142 Wardour Street

…7-storey hotel. London, UK 2008 | 2012 3065 sq. m CAM-V + CAM-C Direct Expansion 1848 1851 1850 1847 Consultant – Flatt Consulting | Taylor Project Services | Watkins Payne Partnership Main Contractor – I4 Interiors | Orchard Build M&E Contractor – Envirotech Services | MB Air | LSC Building…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

BMW China Services, Shanghai

Leading car manufacturer BMW have recently moved into new offices in one of the mixed-use buildings at the White Magnolia Plaza, Shanghai. The mixed use development consists of a 320m office high rise, a hotel tower as well as a series of smaller scale buildings. The complex is part of…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Bridge House

…London Bridge, Bridge House, was originally built in 1832 as a hotel, and subsequently altered in the 1960s with a rear annex added in the 1970s. The refurbishment of the building was led by award winning Emrys Architects, who obtained planning consent to remove the 1960s rooflights, create new windows,…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Flax House, Belfast

…Adelaide Street in 2016 after it had been derelict for 30 years. The refurbished and fully extended Flax House now offers 5 storeys of exceptional grade-A office space, with each floor plate typically configured to provide around 5597 sq.ft lettable space. Underfloor air conditioning, with full underfloor supply, and underfloor…
(Search hits: 1 in body, 0 in title. Relevance score: 532.4)

Flexible Space Distribution

…( Bahrain ) LLC Gekkold 109383, Moscow, Batyuninsky Proezd, 41, building 3 55.6599905 37.70669669999995 +7 (495) 640-98-10 http://www.gekkold.com/ 1117 Golvbolaget Stockholm AB Solkraftsvägen 16 A, 135 70 Stockholm, Sweden 59.23847509999999 18.1926373 Mr Peter Schering peter.schering@golvbolaget.se +46 (0)87 18 26 00 http://www.golvbolaget.se/ 1118 Air Solutions International Pty Ltd Suite 405, 20…
(Search hits: 0 in body, 0 in title. Relevance score: 372.7)

Underfloor Air Conditioning Upgrade for 16-18 Kirby Street

AET Flexible Space have just completed a full upgrade of the underfloor air conditioning system on the first floor of 16-18 Kirby Street, occupied by creative agency 7Fold. The 26,000 sq. ft., 1960’s post war building was fully refurbished in 2006, enlarged and remodelled by Architect, Buckley Gray Yeoman, with…
(Search hits: 1 in body, 0 in title. Relevance score: 266.28)

UfAC for Centrica Energy Aberdeen Headquarters

…Justice Mill Lane project, comprising grade A office accommodation, a high quality business hotel and underground parking. The development was completed at the end of 2010 and within months two leading energy companies had secured tenancies in the IQ building equally sharing the 13,766 m2 office accommodation. The IQ Building…
(Search hits: 1 in body, 0 in title. Relevance score: 266.22)

Historic 196 Deansgate in Manchester Adopts Under Floor Air Conditioning

…settings. This flexibility makes it easy and economical to adapt to future changes in the workplace, making it an attractive commercial option for growing businesses. AET originally supplied their unique under floor air conditioning equipment during a partial refurbishment of the upper floors in 2008. In 2016, developer Commercial Estates…
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Sir William Perkin Sixth Form Centre opts for UfAC

…the Fatronic controller integrated into each fan terminal unit. The order was placed in February 2015 and delivery of AET equipment was completed in August. Phase II construction will commence on site immediately and is due to completed by the end of the year ready for the 2016 Spring Term….
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Comfort Cooling at Tricorn House, Birmingham

…9th Floor were completed in addition to fit out supply for the 9th and 10th floors. The latest specification included the latest slimline fan terminal units incorporating EC Fan technology which are easily accommodated within the shallow 175mm floor void. In 2016, the remaining two floors (3rd and 4th) are…
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

UfAC Upsurge in Latvia

…most HVAC systems are fixed, they can easily become unsuitable or even redundant leading to huge wastage and high costs. Over the course of 2016, AET and Hitex have been working to fulfil three orders to major re-developments in Riga; the Triangula Bastions Business Centre, the Mukusalas Business Centre and…
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Underfloor Air Conditioning for Historic Flax House, Belfast

…Street in 2016 after it had been derelict for 30 years. The refurbished and fully extended Flax House now offers five storeys of exceptional grade-A office space, with each floor plate typically configured to provide around 5597 sq. ft. lettable space. Underfloor air conditioning, with full underfloor supply, and underfloor…
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

UfAC at 20 Soho Square on Track to Improve User Wellbeing

…however the property achieved notoriety in Q1 2016 by being rated the fourth biggest property transaction by size when Palantir Technologies UK Ltd acquired the whole 64,606 ft2 on a ten year lease at an average rent of £74 per ft2. The incoming tenant has opted to finalise the fit…
(Search hits: 1 in body, 0 in title. Relevance score: 266.2)

Resources

…solutions. Heat Interface Units https://www.flexiblespace.com/hiu/ 1470 1 Camel Solar We are able to offer the highest efficiency Solar Thermal Collectors and the latest technology in Solar PVT (Water cooled Solar PV for high efficiency) Solar Thermal Collectors http://www.camel-solar.com/cs/ 2087 1 Controls Fatronic Flexmatic Flexmatic Touch FlexTouch Flexgateway-Flexvisor 1388 Components FSS…
(Search hits: 0 in body, 0 in title. Relevance score: 186.45)

Parkview Green FangCao Di

…Archicreation January 2015 Parkview Green FangCaoDi, CIBSE Sep 2012 Parkview Green FangCao Di Parkview Green FangCao Di Parkview Green FangCao Di 4 Beijing, China 2008 82,000 sq m A-Grade Office Space and a Boutique Hotel Hybrid system with Chilled Ceilings and Fantiles 19 511 510 512 509 Parkview Green FangCao…
(Search hits: 0 in body, 0 in title. Relevance score: 106.49)

Jaguar Land Rover Manufacturing Plant

…20 Architect = Associated Architects Client = Jaguar Land Rover Consultant = Arup M&E Consultant = NG Bailey Jaguar Land Rover Manufacturing Plant 2 496 Staffordshire, UK 2016 1274 sq m CAM-C Underfloor supply air, underfloor return air 19 495 Jaguar Land Rover Manufacturing Plant Architect – Associated Architects Client…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

33 Glasshouse Street, London

…33 Glasshouse Street, London 33 Glasshouse Street, London 3 London, UK 52,000 sq ft CAM-C Direct Expansion Underfloor supply air and underfloor return air 245 246 247 Architect – Buckley Grey Yeoman Consultant – WPP Main Contractor – McLaren M & E Contractor – Emico 2016 18 245 246 247…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

First Point Building, Gatwick

…latest news here… First Point Building, Gatwick First Point Building, Gatwick 2 Gatwick, UK 1998 / 2016 6,815 sq m CAM-C Underfloor supply and underfloor return air 19 493 494 Architect – Reid Architecture Consultant – Roger Preston & Partners Developer – BAA Lynton M&E Contractor – Amec 493 494…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.