You searched for building-magazine-cam-2006 — AET Flexible Space
Search

How UfAC works

…Zonal systems use downflow units (CAM-C or CAM-V) and air terminals (Fantile). CAM-C System Configuration Click on the image to see the configuration in detail CAM-V System Configuration Click on the image to see the configuration in detail CAM-C System Fully Underfloor, Supply And Return Air   The CAM-C system…
(Search hits: 16 in body, 0 in title. Relevance score: 14905.12)

No.1 Cavendish Place

…Flexible Space System has allowed us to incorporate highly effective air-conditioning in a very unobtrusive way.” Specified and procured by Surrey-based project consultancy, PSM Project Services & Management, AET’s system covers over 1,500m2, on four floors of the Cavendish Place building. The CAM-C UfAC system uses the plenum under the…
(Search hits: 9 in body, 0 in title. Relevance score: 5110.33)

CAM-C Zonal System

…and control of CAMs, Fantiles and zone communications. The Flexmatic-E/Flexmatic Touch can monitor up to 16 CAM, or 8 if the system is configured with an external BMS CAM-C 1129 The CAM-C delivers conditioned air into the supply plenum and receives return air via the underfloor plenum for re-conditioning. The…
(Search hits: 3 in body, 1 in title. Relevance score: 5030.48)

CAM-V Zonal System

…Touch can monitor up to 16 CAM, or 8 if the system is configured with an external BMS CAM-V Unit 1156 The CAM-V delivers conditioned air into the supply plenum and receives return air at high level for re-conditioning. The unit is mounted on a standard baseframe with no airflow…
(Search hits: 3 in body, 1 in title. Relevance score: 5030.48)

Harella House

…to the CAM via return grilles, which are located at floor level with the CAM-C system, and at high-level for the CAM-V system, where it is reconditioned and is mixed with fresh air to achieve high standards of indoor air quality. The internal layout for Harella House needed to be…
(Search hits: 9 in body, 0 in title. Relevance score: 5003.86)

16-18 Kirby Street

1960’s post war building fully refurbished 2006. Architect, BuckleyGrayYeoman specified innovative silicon fixed flush-faced glazing formed a series of projecting ‘picture frames’ for each floor, integrating building signage, access and services. The building was also enlarged and remodelled as part of the redevelopment with extensions to the basement, ground, first…
(Search hits: 8 in body, 0 in title. Relevance score: 4684.63)

Menara Telekom Tower

…occupant comfort throughout the building. A total of 227 CAM-V33 units and 1800 standard TU4 Fantiles are installed throughout the building, the modular nature of the system allowing the A/C installation to be delayed until the building reached the construction of the 40th floor. The TU4 Fantiles easily fit into…
(Search hits: 8 in body, 0 in title. Relevance score: 4578)

72 Broadwick Street

…residential apartments. Structural alterations to the building included façade removal, extension of the floorplates, and a newly rebuilt 5th floor, and dynamic new profiled roof. “The innovative repurposing and refurbishment of this landmark building, which occupies an island site of 0.5 acres fronting Carnaby Street, will deliver much-improved commercial and…
(Search hits: 8 in body, 0 in title. Relevance score: 4471.92)

10 St Giles Square

…was key to achieving building consent for the works as well as retaining the building’s unique design features. A total of four of AET Flexible Space’s CAM-C25 units and 42 TU4-EC Fantiles™ were installed to serve the 550m2 of office space. AET’s CAM-C system utilises the floor void as both…
(Search hits: 8 in body, 0 in title. Relevance score: 4365.07)

SAS Marlow

…through the building to enhance natural ventilation, while the first-floor exposed metal ceiling is dominated by large structural beams. These characteristics made it impossible to install a conventional ceiling-based air conditioning system without major structural changes and significant costs. Fortunately, the building already had a 250mm high raised access floor,…
(Search hits: 8 in body, 0 in title. Relevance score: 4365.07)

Film House, 142 Wardour Street

Film House is an iconic building at 142 Wardour Street in the heart of Soho and once home to the Associated British Pathé film company. The building was refurbished in phases between 2006 and 2012 and underfloor air conditioning was installed throughout the four floors as part of these phased…
(Search hits: 7 in body, 0 in title. Relevance score: 4152.28)

Fitout & Maintenance

…& Maintenance The videos below show how office and workspace is easily changed from CAT A speculative space to CAT B occupied space. CAM-C System Fully Underfloor, Supply and Return Air CAM-V System Underfloor Supply Air, High Level Return Air AET offer preventative and reactive service and maintenance and fit-out…
(Search hits: 3 in body, 0 in title. Relevance score: 4098.91)

The Center, Hong Kong

…The building was originally designed at 381m, but by utilising the AET Flexible Space underfloor air conditioning systems the developer was able to reduce the building height by 35m. Approximately $US 7 million was saved in curtain walling alone as a direct result of reducing the building height, this amounted…
(Search hits: 7 in body, 0 in title. Relevance score: 4045.67)

Hammersley House

…direct expansion, configured with either floor level (CAM-C) or high level (CAM-V) return and they can easily integrate with passive or other ventilation systems. The final system specification at Hammersley House is a CAM-V direct expansion (DX) system, with underfloor supply air and return air at high level. The high…
(Search hits: 7 in body, 0 in title. Relevance score: 3939.21)

Bridge House

…total of 13 CAM-V33 Conditioned Air Modules (CAM’s) were installed across five floors which are served by high-efficiency, roof mounted heat pump units. Conditioned air is delivered into the space by AET’s market leading fan assisted Fantile™ units which fit seamlessly within the raised floor void. A mixture of AET’s…
(Search hits: 7 in body, 0 in title. Relevance score: 3939.21)

UfAC at 20 Soho Square on Track to Improve User Wellbeing

…21 next door. In 1924-6, the original building was demolished and re-built by Cross and Blackwell as their headquarters building. In 2002, the owner developer increased the building’s gross floor area by 16% by adding a new top floor on the roof of the existing rear extension. At the same…
(Search hits: 14 in body, 0 in title. Relevance score: 3726.28)

Energy Efficiency Award for Latvian Bank HQ

…achieve top ratings for “Most Energy-efficient Building in Latvia, 2011” and “Most Sustainable Building in Latvia, 2011”. Designed by architects Sarma&Norde, the Nordea building is now an A-class office premises, which experts recognise as setting a prime example for “green-building” architecture and construction. Retrofitted as a frame-type building with reinforced…
(Search hits: 14 in body, 0 in title. Relevance score: 3726.28)

Flax House, Belfast

…return air was specified, so that the warehouse loft ceilings could be left exposed, highlighting the retained features and building characteristics. A total of 11 CAM-C downflow units and 128 TU4 Fantiles were supplied for the 5 storey building, completed in early 2018. The building is now fully let, each…
(Search hits: 6 in body, 0 in title. Relevance score: 3513.38)

169 Union Street

This four-storey red brick building dates back to 1905 and originally served as a Royal Mail sorting office. AET’s UfAC system was specified to overcome the building’s restrictive height limitations, which are common in older stock buildings.buildings….
(Search hits: 6 in body, 0 in title. Relevance score: 3513.35)

Achieving Design Freedom with Underfloor Air Conditioning

In practice, incumbent building services can help architects and designers overcome planning and structural constraints. Building typology comes in all shapes and sizes, each with its own unique design criteria. Frequently building services, heating, ventilation and air conditioning in particular can be challenging to integrate into a building design but…
(Search hits: 13 in body, 0 in title. Relevance score: 3513.35)

Plenum Air Conditioning for Refurbishment and Retrofit Projects

A major design challenge for refurbishment case studies is how to incorporate high specification heating and cooling into buildings designed long before air conditioning of commercial buildings became a reality. In the UK we have a large amount of older building stock requiring modernisation. Often developers will strip these buildings…
(Search hits: 13 in body, 0 in title. Relevance score: 3460.12)

20 Red Lion Street

…TU350 slim line Fantiles™ were installed. Due to the proximity of the CAM unit to the exterior of the building, a perimeter return air path was used to maximise the supply air path. The sixth floor is glazed on three sides, meaning that solar gain was high, and that maximum…
(Search hits: 6 in body, 0 in title. Relevance score: 3406.88)

The Hoxton (Wedge House)

…was due to a reduced 170mm floor void in these areas, which was a result of the design of the building’s structure. Southwark, London, UK 2020 3500 m2 CAM-V – floor supply, high-level return 2211 2209 2208 2206 2207 2210 Developer – Enismore (The Hoxton Group) Architect – Lifschutz Davidson…
(Search hits: 6 in body, 0 in title. Relevance score: 3406.88)

Majid Al Futtaim Tower 2

Leading retail and leisure pioneer across the Middle East and North Africa (MENA) region is awarded the LEED EBOM Gold rating by the United States Green Building Council for the head office building in Dubai. The building’s environmental impact was assessed at the end of 2013 and compared with the…
(Search hits: 5 in body, 0 in title. Relevance score: 3406.88)

Shatin Industrial Centre

…architects. The AET CAM-C Direct Expansion (DX) underfloor air conditioning system was specified for the co-working space, and had a significant impact on its design. The CAM-C Direct Expansion system is ideally suited to refurbishments, or buildings with space constraints, as it can maximise the use of space. This project…
(Search hits: 6 in body, 0 in title. Relevance score: 3300.42)

The Gilbert & One Lackington

…systems were originally installed on the 1st, 2nd, 3rd, 4th, and 5th floors as part of a major refurbishment works which were completed in 2001 shortly after the building became the European Headquarters for media giant Bloomberg. Later that year the building was awarded the BCO’s Fit Out Workplace of…
(Search hits: 6 in body, 0 in title. Relevance score: 3300.42)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.