You searched for sitemap-pvt-post-2014-zd.hotel — AET Flexible Space
Search

Solar Panels and Collectors

Please visit our dedicated site http://www.camel-solar.com Store energy the Camel Solar way with new PVT panels HAVE YOU CONSIDERED installing solar PV panels on your roof? It makes more sense now than ever with new Camel PVT collectors. These produce 20% more electricity than conventional PV Solar Panels plus three…
(Search hits: 5 in body, 0 in title. Relevance score: 4661.23)

The Hoxton (Wedge House)

The Hoxton, Southwark, is an ambitious new refurbishment of a former social security office located on London’s south bank. The Hoxton Hotel incorporates 192 hotel rooms, restaurants, bars and function rooms, as well as 4,000 m2 of flexible co-working office space, the all within a sleek and contemporary building. The…
(Search hits: 5 in body, 0 in title. Relevance score: 2875.15)

Nina Tower

…incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space This Mega Project became a new landmark of Hong Kong in 2008. A total of 131 Floors in the Two Towers incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space AET…
(Search hits: 1 in body, 0 in title. Relevance score: 745.41)

180 Great Portland Street

…of indoor air quality. AET’s flexible underfloor UfAC solution allowed for a minimum floor plenum of 200mm. This maximised the floor to ceiling height, and post refurbishment enabled a 35% increase in total occupancy. Sustainability played an important role in the brief, with the specification of the building services having…
(Search hits: 1 in body, 0 in title. Relevance score: 639.06)

Centrica

Part of a major redevelopment of a dilapidated area in the Western area of Aberdeen. The Justice Mill Lane project comprises grade-A commercial office space at The IQ building, a high quality business hotel and underground parking. The 13,766 sq m building offers large flexible floor plates and an impressive…
(Search hits: 1 in body, 0 in title. Relevance score: 638.92)

Jaguar Land Rover Design Centre

…by more than 750 Fantile units. Since the original building works there have been a number of upgrades and add-ons as well as another 7,500 sq m building in 2004 for Aston Martin’s project Goldline. In 2014 AET completed a major controls upgrade. The site has won a number of…
(Search hits: 1 in body, 0 in title. Relevance score: 638.91)

16-18 Kirby Street

1960’s post war building fully refurbished 2006. Architect, BuckleyGrayYeoman specified innovative silicon fixed flush-faced glazing formed a series of projecting ‘picture frames’ for each floor, integrating building signage, access and services. The building was also enlarged and remodelled as part of the redevelopment with extensions to the basement, ground, first…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

10 St Giles Square

…as the most suitable HVAC solution as it allowed the project team to preserve and highlight the remarkable cantilevered roof. This very light concrete roof is set on a post-tensioned structure which allows the building to span over St Giles High Street below. Using an underfloor air conditioning system meant…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

BMW China Services, Shanghai

Leading car manufacturer BMW have recently moved into new offices in one of the mixed-use buildings at the White Magnolia Plaza, Shanghai. The mixed use development consists of a 320m office high rise, a hotel tower as well as a series of smaller scale buildings. The complex is part of…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Bridge House

…London Bridge, Bridge House, was originally built in 1832 as a hotel, and subsequently altered in the 1960s with a rear annex added in the 1970s. The refurbishment of the building was led by award winning Emrys Architects, who obtained planning consent to remove the 1960s rooflights, create new windows,…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Film House, 142 Wardour Street

…7-storey hotel. London, UK 2008 | 2012 3065 sq. m CAM-V + CAM-C Direct Expansion 1848 1851 1850 1847 Consultant – Flatt Consulting | Taylor Project Services | Watkins Payne Partnership Main Contractor – I4 Interiors | Orchard Build M&E Contractor – Envirotech Services | MB Air | LSC Building…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Jaguar Land Rover Manufacturing Plant

The new building is part of JLR’s manufacturing expansion plans adding to the £500 million engine plant on the i54 Business Park, opened at the end of 2014. The initial HVAC brief specified trench heating for the perimeter areas of the office facilities. M&E specialists NG Bailey were satisfied that…
(Search hits: 1 in body, 0 in title. Relevance score: 532.42)

24 St James’s Square

…the developer, Misland Capital, to consider AET’s system’s based on their positive experience with 28 Saville Row which AET completed in 2014. St James’s, London, UK 2020 1600 m2 CAM-V – floor supply, high-level return 2289 2291 2292 2290 2288 2123 2142 2145 Developer – Misland Capital Architect – BLDA…
(Search hits: 1 in body, 0 in title. Relevance score: 532.42)

Flexible Space Distribution

…( Bahrain ) LLC Gekkold 109383, Moscow, Batyuninsky Proezd, 41, building 3 55.6599905 37.70669669999995 +7 (495) 640-98-10 http://www.gekkold.com/ 1117 Golvbolaget Stockholm AB Solkraftsvägen 16 A, 135 70 Stockholm, Sweden 59.23847509999999 18.1926373 Mr Peter Schering peter.schering@golvbolaget.se +46 (0)87 18 26 00 http://www.golvbolaget.se/ 1118 Air Solutions International Pty Ltd Suite 405, 20…
(Search hits: 0 in body, 0 in title. Relevance score: 372.7)

Underfloor Air Conditioning Upgrade for 16-18 Kirby Street

AET Flexible Space have just completed a full upgrade of the underfloor air conditioning system on the first floor of 16-18 Kirby Street, occupied by creative agency 7Fold. The 26,000 sq. ft., 1960’s post war building was fully refurbished in 2006, enlarged and remodelled by Architect, Buckley Gray Yeoman, with…
(Search hits: 1 in body, 0 in title. Relevance score: 266.28)

UfAC for Centrica Energy Aberdeen Headquarters

…Justice Mill Lane project, comprising grade A office accommodation, a high quality business hotel and underground parking. The development was completed at the end of 2010 and within months two leading energy companies had secured tenancies in the IQ building equally sharing the 13,766 m2 office accommodation. The IQ Building…
(Search hits: 1 in body, 0 in title. Relevance score: 266.22)

Flexible HVAC for Jaguar Land Rover’s New Manufacturing Plant

…million engine plant on the i54 site which was opened at the end of 2014. The latest building has been delivered by Associated Architects in partnership with Arup. The initial HVAC brief specified trench heating for the perimeter areas of the office facilities, however, after discussions with M&E specialists NG…
(Search hits: 1 in body, 0 in title. Relevance score: 266.21)

Comfort Cooling at Tricorn House, Birmingham

…and maintenance requirements. The phased project continued over subsequent years, each floor being refurbished as tenant leases expired. AET Flexible Space equipment has proved to be ideal for this application, easily accommodating new fit out requirements as new tenants secured office space. In 2014, the 5th, 7th Floor and the…
(Search hits: 1 in body, 0 in title. Relevance score: 266.21)

Prestigious New Build in Ghana Chooses Under Floor Air Conditioning

…Laurus Development partners, a portfolio company of Actis. Construction commenced on site in 2012, with a major milestone achieved in February 2014 when workers celebrated topping out 26 days ahead of schedule. The compact design features an internal atrium which has the function of providing light and facilitating natural ventilation…
(Search hits: 1 in body, 0 in title. Relevance score: 266.21)

Underfloor Services for 55 Gresham Street Top Floor

AET Flexible Space recently completed the supply and commissioning of underfloor air conditioning equipment for the new ninth floor at 55 Gresham Street. Situated near the Guildhall in the heart of the City, the 84,038 sq. ft., eight storey building was acquired in 2014 by Angelo Gordon and Beltane, extended…
(Search hits: 1 in body, 0 in title. Relevance score: 266.21)

Flexible Space goes down under!

…with upgraded facilities was proposed as part of the Shellharbour Council Libraries & Museum Strategy 2014. The existing facility was constructed in 1968, but is inappropriately located and not purpose built as a library, and without co-located community services, deemed necessary for a modern facility. AET received this first Australian…
(Search hits: 1 in body, 0 in title. Relevance score: 266.21)

Resources

…solutions. Heat Interface Units https://www.flexiblespace.com/hiu/ 1470 1 Camel Solar We are able to offer the highest efficiency Solar Thermal Collectors and the latest technology in Solar PVT (Water cooled Solar PV for high efficiency) Solar Thermal Collectors http://www.camel-solar.com/cs/ 2087 1 Controls Fatronic Flexmatic Flexmatic Touch FlexTouch Flexgateway-Flexvisor 1388 Components FSS…
(Search hits: 0 in body, 0 in title. Relevance score: 186.45)

Parkview Green FangCao Di

…Archicreation January 2015 Parkview Green FangCaoDi, CIBSE Sep 2012 Parkview Green FangCao Di Parkview Green FangCao Di Parkview Green FangCao Di 4 Beijing, China 2008 82,000 sq m A-Grade Office Space and a Boutique Hotel Hybrid system with Chilled Ceilings and Fantiles 19 511 510 512 509 Parkview Green FangCao…
(Search hits: 0 in body, 0 in title. Relevance score: 106.49)

One Airport Square

…project beyond the facade outline to provide solar shading, large floor plates and a central atrium enhancing the natural ventilation. Consultants BDSP estimate that a 30% reduction in active cooling is achievable by employing the sustainable design 3 Accra, Ghana 2014 20,000 sq m CAM-V Underfloor supply air, high level…
(Search hits: 0 in body, 0 in title. Relevance score: 106.48)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.