You searched for sitemap-pvt-post-2017-zd.hotel — AET Flexible Space
Search

Solar Panels and Collectors

Please visit our dedicated site http://www.camel-solar.com Store energy the Camel Solar way with new PVT panels HAVE YOU CONSIDERED installing solar PV panels on your roof? It makes more sense now than ever with new Camel PVT collectors. These produce 20% more electricity than conventional PV Solar Panels plus three…
(Search hits: 5 in body, 0 in title. Relevance score: 4661.23)

The Hoxton (Wedge House)

The Hoxton, Southwark, is an ambitious new refurbishment of a former social security office located on London’s south bank. The Hoxton Hotel incorporates 192 hotel rooms, restaurants, bars and function rooms, as well as 4,000 m2 of flexible co-working office space, the all within a sleek and contemporary building. The…
(Search hits: 5 in body, 0 in title. Relevance score: 2875.15)

Fitout & Maintenance

…1909 1910 1911 1912 14 1512 Savile Row – 3rd Floor – August 2017 Cat-B fit-out of 2nd, 3rd and 5th floor workspace at 33 Glasshouse Street for new incoming tenant, one of the world’s biggest tech giants. Working for Modus Workspace, AET supplied and installed new underfloor barrier, carried…
(Search hits: 0 in body, 0 in title. Relevance score: 1304.31)

Nina Tower

…incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space This Mega Project became a new landmark of Hong Kong in 2008. A total of 131 Floors in the Two Towers incorporate a Transport Terminal, Car Park Facilities, Hotel Accommodation, Retail, Exhibition and Office Space AET…
(Search hits: 1 in body, 0 in title. Relevance score: 745.41)

8 Waterloo Place

…finish with no services at high level to allow the decorative feature plasterwork in the ceiling to be exposed, underfloor air conditioning was subsequently specified by consultant Watkins Payne Partnership for four of the seven floors. Shortlisted for 2017 BREEAM Awards – Refurbishment category London, UK 2017 3065 sq m…
(Search hits: 1 in body, 0 in title. Relevance score: 745.32)

180 Great Portland Street

…of indoor air quality. AET’s flexible underfloor UfAC solution allowed for a minimum floor plenum of 200mm. This maximised the floor to ceiling height, and post refurbishment enabled a 35% increase in total occupancy. Sustainability played an important role in the brief, with the specification of the building services having…
(Search hits: 1 in body, 0 in title. Relevance score: 639.06)

Centrica

Part of a major redevelopment of a dilapidated area in the Western area of Aberdeen. The Justice Mill Lane project comprises grade-A commercial office space at The IQ building, a high quality business hotel and underground parking. The 13,766 sq m building offers large flexible floor plates and an impressive…
(Search hits: 1 in body, 0 in title. Relevance score: 638.92)

Triangula Bastion, Latvia

…were discovered and subsequently excavated and preserved within the new building. The Triangula Bastion was dated to 1727, pentagonal in plan and the smallest, yet highest of the bastions. In 2017, the building underwent a fit-out for building owners Eurolive Technologies, the world’s second largest online gaming company. Underfloor air…
(Search hits: 1 in body, 0 in title. Relevance score: 638.85)

Mikrotik, Latvia

…TU4 Fantiles introducing conditioned air into the space. Mikrotik occupied the new space in summer 2017. Riga, Latvia 2017 1790 sq m CAM-C Underfloor supply air, underfloor return air 1955 1954 1956 1957 1958 Developer – Friteks End User – Mikrotik Main Contractor – Zenico Projekts M&E Contractor – Lafivents…
(Search hits: 1 in body, 0 in title. Relevance score: 638.85)

Mukusalas 42, Latvia

…unit, and a total of 115 TU4 Fantiles throughout the building. The project was completed in early 2017. Riga, Latvia 2017 1,430 sq m CAM-C Underfloor supply air, underfloor return air 1929 1930 1931 1932 Architect – Liga Vanaga Client – Mukusalas Business Centres Developer – Pro Dev SIA 942…
(Search hits: 1 in body, 0 in title. Relevance score: 638.85)

16-18 Kirby Street

1960’s post war building fully refurbished 2006. Architect, BuckleyGrayYeoman specified innovative silicon fixed flush-faced glazing formed a series of projecting ‘picture frames’ for each floor, integrating building signage, access and services. The building was also enlarged and remodelled as part of the redevelopment with extensions to the basement, ground, first…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

10 St Giles Square

…as the most suitable HVAC solution as it allowed the project team to preserve and highlight the remarkable cantilevered roof. This very light concrete roof is set on a post-tensioned structure which allows the building to span over St Giles High Street below. Using an underfloor air conditioning system meant…
(Search hits: 1 in body, 0 in title. Relevance score: 532.55)

Film House, 142 Wardour Street

…7-storey hotel. London, UK 2008 | 2012 3065 sq. m CAM-V + CAM-C Direct Expansion 1848 1851 1850 1847 Consultant – Flatt Consulting | Taylor Project Services | Watkins Payne Partnership Main Contractor – I4 Interiors | Orchard Build M&E Contractor – Envirotech Services | MB Air | LSC Building…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

BMW China Services, Shanghai

Leading car manufacturer BMW have recently moved into new offices in one of the mixed-use buildings at the White Magnolia Plaza, Shanghai. The mixed use development consists of a 320m office high rise, a hotel tower as well as a series of smaller scale buildings. The complex is part of…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

Bridge House

…London Bridge, Bridge House, was originally built in 1832 as a hotel, and subsequently altered in the 1960s with a rear annex added in the 1970s. The refurbishment of the building was led by award winning Emrys Architects, who obtained planning consent to remove the 1960s rooflights, create new windows,…
(Search hits: 1 in body, 0 in title. Relevance score: 532.44)

High Specification Category-B Fit-out for 8 Waterloo Place

…Partnership after both the client and architect requested no ceiling based services in order to allow the decorative plasterwork and featured cornices to be exposed. The AET Flexible Space CAM-C direct expansion system fits this brief perfectly. The Cat-A works were completed in August 2017 and the building was subsequently…
(Search hits: 2 in body, 0 in title. Relevance score: 532.37)

The Center, Hong Kong

…to approximately 10% of the total construction cost. Whilst CAM units were not required for the project, 6500 Fantile units were installed over 59 floors of speculative office accommodation. Providing comfort cooling and aiding the developer to achieve class 1 air certification. The Center was sold in 2017 for a…
(Search hits: 1 in body, 0 in title. Relevance score: 532.37)

UfAC Upsurge in Latvia

…manufacturing company in Latvia until the Second World War. In 1989, the two buildings on the 13,000 m2 site were destroyed by fire and were left disused until now. Restoration of the building envelope has already begun and constructors hope to complete the challenging project by summer 2017. The brief…
(Search hits: 2 in body, 0 in title. Relevance score: 532.37)

Underfloor Air Conditioning fits the bill at 8 Waterloo Place

…play TU4 Fantile units with the upgraded EC fan option for additional energy efficiency. Completed in April 2017, the refurbishment was successful in creating fully refurbished, additional net area grade-A office space, an enlarged reception and alterations to the top storey to create a roof terrace. The building was also…
(Search hits: 2 in body, 0 in title. Relevance score: 532.37)

Resources

CPD 9 2017: Underfloor air conditioning 1173 It is claimed that underfloor air conditioning can offer improved working conditions. This CPD module, sponsored by AET Flexible Space, considers the different types of system 1174 Product Manuals CPD – Continuing Professional Development 3 Units CAM-C CAM-V CAM-C (DX) CAM-V (DX) TU4…
(Search hits: 0 in body, 0 in title. Relevance score: 372.78)

Flexible Space Distribution

…( Bahrain ) LLC Gekkold 109383, Moscow, Batyuninsky Proezd, 41, building 3 55.6599905 37.70669669999995 +7 (495) 640-98-10 http://www.gekkold.com/ 1117 Golvbolaget Stockholm AB Solkraftsvägen 16 A, 135 70 Stockholm, Sweden 59.23847509999999 18.1926373 Mr Peter Schering peter.schering@golvbolaget.se +46 (0)87 18 26 00 http://www.golvbolaget.se/ 1118 Air Solutions International Pty Ltd Suite 405, 20…
(Search hits: 0 in body, 0 in title. Relevance score: 372.7)

AET sponsors the BD Architect of the Year Awards

AET Flexible Space, leading provider of Under Floor Air Conditioning systems is proudly sponsoring the Refurbishment Architect of the Year category at this year’s prestigious BD Architect of the Year Awards 2017. Launched in 2004 and organised by Building Design, the BD Architect of the Year Awards distinguishes architectural practices,…
(Search hits: 1 in body, 0 in title. Relevance score: 319.42)

Underfloor Air Conditioning Upgrade for 16-18 Kirby Street

AET Flexible Space have just completed a full upgrade of the underfloor air conditioning system on the first floor of 16-18 Kirby Street, occupied by creative agency 7Fold. The 26,000 sq. ft., 1960’s post war building was fully refurbished in 2006, enlarged and remodelled by Architect, Buckley Gray Yeoman, with…
(Search hits: 1 in body, 0 in title. Relevance score: 266.28)

UfAC for Centrica Energy Aberdeen Headquarters

…Justice Mill Lane project, comprising grade A office accommodation, a high quality business hotel and underground parking. The development was completed at the end of 2010 and within months two leading energy companies had secured tenancies in the IQ building equally sharing the 13,766 m2 office accommodation. The IQ Building…
(Search hits: 1 in body, 0 in title. Relevance score: 266.22)

Innovative Underfloor Air Conditioning for Plexal at Here East

…in the central Plexal corridor within special acoustic enclosures. The Here East development in Stratford was officially opened in June 2017 but was already 55% pre-let 18 months before completion. Plexal has created a truly unique and flexible workspace offering for the new generation of digital and tech business occupiers….
(Search hits: 1 in body, 0 in title. Relevance score: 266.19)

Underfloor Air Conditioning Upgrade for Avaya Fit Out

…office space did not permit full building installation of underfloor air conditioning, but it was deemed appropriate to serve the Atrium area. The fit-out works for Avaya were carried out by main contractor, Realys, and AET worked with M&E contractor, AMD Environmental on the recent project. The 2017 upgrade was…
(Search hits: 1 in body, 0 in title. Relevance score: 266.19)

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.